Monthly EM amp A Report

Monthly Em Amp A Report-PDF Download

  • Date:02 Jun 2020
  • Views:25
  • Downloads:0
  • Pages:71
  • Size:6.67 MB

Share Pdf : Monthly Em Amp A Report

Download and Preview : Monthly Em Amp A Report


Report CopyRight/DMCA Form For : Monthly Em Amp A Report


Transcription:

Balfour Contract No HK 2015 01,Bea y Lam Geotechnics Limited. Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,TABLE OF CONTENTS,EXECUTIVE SUMMARY 3. 1 INTRODUCTION 4,1 1 Scope of the Report 5,1 2 Structure of the Report 5. 2 PROJECT BACKGROUND 7,2 1 Background 7,2 2 Scope of the Project and Site Description 7. 2 3 Project Organization and Contact Personnel 8,3 STATUS OF REGULATORY COMPLIANCE 8.
3 1 Status of Environmental Licensing and Permitting under the Project 9. 4 MONITORING REQUIREMENTS 11,4 1 Noise Monitoring 11. 4 2 Air Quality Monitoring 12,5 MONITORING RESULTS 14. 5 1 Noise Monitoring Results 14,5 2 Air Quality Monitoring Results 15. 5 3 WASTE MONITORING RESULTS 16,6 COMPLIANCE AUDIT 17. 6 1 Noise Monitoring 17,6 2 Air Quality Monitoring 17.
6 3 Review of the Reasons for and the Implications of Non compliance 17. 6 4 Summary of action taken in the event of and follow up on non compliance 17. 7 CUMULATIVE CONSTRUCTION IMPACT DUE TO THE CONCURRENT PROJECTS 18. 8 ENVIRONMENTAL SITE AUDIT 19, 9 COMPLAINTS NOTIFICATION OF SUMMONS AND PROSECUTION 20. 10 CONCLUSION 21,EP 376 2009,Balfour Contract No HK 2015 01. Bea y Lam Geotechnics Limited, Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,LIST OF TABLES, Table 2 1 Schedule 2 Designated Projects under this Project. Table 2 2 Contact Details of Key Personnel, Table 3 1 Summary of the current status on licences and or permits on environmental.
protection pertinent to the Project, Table 3 2 Cumulative Summary of Valid Licences and Permits under Contract no HK 2012 08. Table 3 3 Summary of submission status under FEP 01 376 2009 Condition. Table 4 1 Noise Monitoring Stations,Table 4 2 Air Quality Monitoring Stations. Table 5 1 Noise Monitoring Stations for Contract no HK 2012 08. Table 5 2 Air Quality Monitoring Station for Contract no HK 2012 08. Table 5 3 Details of Waste Disposal for Contract no HK 2012 08. Table 8 1 Summary of Environmental Inspections for Contract no HK 2012 08. Table 9 1 Cumulative Statistics on Complaints, Table 9 2 Cumulative Statistics on Successful Prosecutions. Table 10 1 Summary of Key Construction Activities of Individual Contract s to be. commenced in Coming Reporting Month,LIST OF FIGURES. Figure 2 1 Project Layout,Figure 2 2 Project Organization Chart.
Figure 4 1 Locations of Environmental Monitoring Stations. LIST OF APPENDICES, Appendix 3 1 Environmental Mitigation Implementation Schedule. Appendix 4 1 Action and Limit Level, Appendix 5 1 Monitoring Schedule for Reporting Month and Coming month. Appendix 5 2 Noise Monitoring Results and Graphical Presentations. Appendix 5 3 Air Quality Monitoring Results and Graphical Presentations. Appendix 6 1 Event Action Plans,Appendix 6 2 Notification of Exceedance. Appendix 9 1 Complaint Log, Appendix 10 1 Construction Programme of Individual Contracts. EP 376 2009,Balfour Contract No HK 2015 01,Bea y Lam Geotechnics Limited.
Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,EXECUTIVE SUMMARY, i This is the Environmental Monitoring and Audit EM A Monthly Report April 2019 specific. for Environmental Permit no EP 376 2009 and Further Environmental Permits no FEP. 01 376 2009 and FEP 02 376 2009 The EM A report is prepared by the Environmental Team. ET employed under Contract No HK 2015 01 Wan Chai Development Phase II and Central. Wanchai Bypass Sampling Field Measurement and Testing Works Stage 3 This report. presents the environmental monitoring findings and information recorded during the period of. 27th March 2019 to 26th April 2019 The cut off date of reporting is at 26th of each reporting. ii In the reporting month the principal work activities of the contract are included as follows. Contract no HK 2012 08 Wan Chai Development Phase II Central Wan Chai Bypass at. Wan Chai West,Landscaping,Noise Monitoring, iii Noise monitoring was conducted at M1a Harbour Road Sports Centre. iv With respect to the shift in major construction site portions at Wan Chai North the noise. monitoring station M1a Harbour Road Sports Centre was finely adjusted from East of Harbour. Road Sports Centre to West of Harbour Road Sports Centre on 21 June 2016. v With respect to the demolition of Ex Harbour Road Sports Centre the respective noise. monitoring station M1a Harbour Road Sports Centre were finely adjusted on 16 and 25 May. 2017 and thereafter to the Footbridge for Harbour Road Sports for noise monitoring. vi With respect to WDII RSS confirmed that the remaining works under HK 2012 08 would be tree. planting works at EP 376 2009 area only considered that no adverse noise impact would be. contributed by the tree planting works the respective noise monitoring at noise monitoring. station M1a Footbridge at EX Wanchai Harbour Road Sports Centre was temporary. suspended from 27 March 2019 onwards,Air Quality Monitoring. vii 1 hour and 24 hour Total Suspended Particulates TSP monitoring were conducted on every. six days basis at CMA5b Pedestrian Plaza and CMA6a Contractor HK 2012 08 Site Office. viii With respect to WDII RSS confirmed that the remaining works under HK 2012 08 would be tree. planting works at EP 376 2009 area only considered that no adverse air quality impact would. be contributed by the tree planting works the respective air quality monitoring at monitoring. stations CMA5b Pedestrian Plaza and CMA6a Contractor HK 2012 08 Site Office were. temporary suspended from 27 March 2019 onwards,EP 376 2009. Balfour Contract No HK 2015 01,Bea y Lam Geotechnics Limited.
Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019, Complaints Notifications of Summons and Successful Prosecutions. ix No environmental complaint was received in this reporting month. Site Inspections and Audit, x The Environmental Team ET conducted weekly site inspection for Contract no HK 2012 08. in this reporting period The Contractors rectified major observations and recommendations. made during the audit sessions No non conformance was identified during the site inspections. Future Key Issues, xi In the coming reporting month the principal work activities of the contract is anticipated as. Contract no HK 2012 08 Wan Chai Development Phase II Central Wan Chai Bypass at. Wan Chai West,Landscaping,EP 376 2009,Balfour Contract No HK 2015 01. Bea y Lam Geotechnics Limited, Wan Chai Development Phase II and Central Wanchai Bypass.
Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,1 INTRODUCTION,1 1 Scope of the Report. 1 1 1 Lam Geotechnics Limited LGL has been appointed take up the role as the Environmental. Team ET under Environmental Permit no EP 376 2009 and Further Environmental Permits. no FEP 01 376 2009 and FEP 02 376 2009 to implement the Environmental Monitoring and. Audit EM A programme as stipulated in the EM A Manual of the approved Environmental. Impact Assessment EIA Report for Wan Chai Development Phase II and Central Wan Chai. Bypass Register No AEIAR 458 2008, 1 1 2 This report documents the finding of EM A works for Environmental Permit EP no EP. 376 2009 and Further Environmental Permits no FEP 01 376 2009 and FEP 02 376 2009. during the period of 27th March 2019 to 26th April 2019 The cut off date of reporting is the 26th. of each reporting month,1 2 Structure of the Report. Section 1 Introduction details the scope and structure of the report. Section 2 Project Background summarizes background and scope of the project site. description project organization and contact details of key personnel during. the reporting period, Section 3 Status of Regulatory Compliance summarizes the status of valid. Environmental Permits Licenses during the reporting period. Section 4 Monitoring Requirements summarizes all monitoring parameters. monitoring methodology and equipment monitoring locations monitoring. frequency criteria and respective event and action plan and monitoring. programmes, Section 5 Monitoring Results summarizes the monitoring results obtained in the.
reporting period, Section 6 Compliance Audit summarizes the auditing of monitoring results all. exceedances environmental parameters, Section 7 Cumulative Construction Impact due to the Concurrent Projects. summarizes the relevant cumulative construction impact due to the concurrent. activities of the concurrent Projects,EP 376 2009,Balfour Contract No HK 2015 01. Bea y Lam Geotechnics Limited, Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019, Section 8 Environmental Site Audit summarizes the findings of weekly site.
inspections undertaken within the reporting period with a review of any. relevant follow up actions within the reporting period. Section 9 Complaints Notification of summons and Prosecution summarizes the. cumulative statistics on complaints notification of summons and prosecution. Section 10 Conclusion,EP 376 2009,Balfour Contract No HK 2015 01. Bea y Lam Geotechnics Limited, Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,2 PROJECT BACKGROUND. 2 1 Background, 2 1 1 Wan Chai Development phase II and Central Wan Chai Bypass hereafter called the Project. are Designated Project DP under the Environmental Impact Assessment Ordinance Cap. 499 EIAO The Environmental Impact Assessment EIA Report for Wan Chai Development. phase II and Central Wan Chai Bypass Register No AEIAR 125 2008 has been approved. on 11 December 2008,2 2 Scope of the Project and Site Description.
2 2 1 The design and construction of Wan Chai Development Phase II and Central Wanchai Bypass. involves the construction and operation of primary and district distributor roads that is shown at. Figure 2 1, 2 2 2 The key purpose of the study area encompasses the Wan Chai harbourfront area The area. starts at the boundary of Central Reclamation Phase III CRIII at the west and connects to the. existing Hung Hing Road at the east The scope of the project includes. A dual 2 lane primary distributor road Road P2 approximately 0 6km in length and. Other new primary and district distributor roads connecting to the slip roads of the. Central Wan Chai Bypass with a total length of approximately 0 7km. 2 2 3 The project also contains various Schedule 2 DP that under the EIAO require Environmental. Permits EPs to be granted by the DEP before they may be either constructed or operated. Table 2 1 summarises the DP under this Project Figure 2 1 shows the locations of these. Schedule 2 DP, Table 2 1 Schedule 2 Designated Project under this Project. Item Designated Project EIAO Reference, DP2 Road P2 and other roads which are classified as Schedule 2 Part I A 1. primary district distributor roads, 2 2 4 The designated project work II DP2 was awarded to China State Leader Joint Venture. HK 2012 08 Contract Title Wan Chai Development Phase II Central Wan Chai Bypass at. Wan Chai West as part of the Project works by the Civil Engineering and Development. Department CEDD The construction work under Contract no HK 2012 08 was commenced. on 13 May 2015,EP 376 2009,Balfour Contract No HK 2015 01.
Bea y Lam Geotechnics Limited, Wan Chai Development Phase II and Central Wanchai Bypass. Sampling Field Measurement and Testing Works Stage 3. Monthly EM A Report April 2019,2 3 Project Organization and Contact Personnel. 2 3 1 Civil Engineering and Development Department and Highway Department are the overall. project controllers for the Wan Chai Development Phase II and Central Wan Chai Bypass. respectively For the construction phase of the Project Project Engineer Contractor s. Environmental Team and Independent Environmental Checker are appointed to manage and. control environmental issues, 2 3 2 The proposed project organization and lines of communication with respect to environmental. protection works are shown in Figure 2 2 Key personnel and contact particulars are. summarized in Table 2 2,Table 2 2 Contact Details of Key Personnel. Party Role Post Name Contact Contact, AECOM Engineer s Chief Resident Ms Gloria Tang 2587 1778 2587 1877.
Representative Engineer, China State Contractor Project C N LAI 9106 5806 2877 1522. Build King under Contract Director,Joint Venture no HK 2012 08 Mr George 9268 1918. Site Agent,Environmental Mr James Ma 9130 9549,Environmental Mr Y L Ho 9856 5669. Supervisor, Ramboll Independent Independent Mr David 3465 2888 3465 2899. Hong Kong Environmental Environmental Yeung,Limited Checker IEC Checker IEC.
Lam Environmental Environmental Mr Raymond 2882 3939 2882 3331. Geotechnics Team ET Team Leader Dai,Limited ETL, 2 3 3 In this reporting month the principal work activities of the contract is included as follows. Contract no HK 2012 08 Wan Chai Development Phase II Central Wan Chai Bypass at. Wan Chai West,Landscaping,2 3 4 In coming reporting month the pri. 7 CUMULATIVE CONSTRUCTION IMPACT DUE TO THE CONCURRENT PROJECTS 18 8 ENVIRONMENTAL SITE AUDIT 19 9 COMPLAINTS NOTIFICATION OF SUMMONS AND PROSECUTION 20 10 CONCLUSION 21 Monthly EM amp A Report Balfour Bea y Lam Geotechnics Limited Contract No HK 2015 01 Wan Chai Development Phase II and Central Wanchai Bypass Sampling Field Measurement and Testing Works Stage 3 April

Related Books