Transcription:

What is the purpose an FAI, The purpose of the First Article Inspection is to provide. objective evidence that all engineering design and. specification requirements are properly understood. accounted for verified and documented, The purpose of this standard is to provide a consistent. documentation requirement,How to write up an FAI step by step. Supplier FAI s,All Detailed Assembly and sub assembly. part shall have a FAI done,AS9102 Form 1 Part Number Accountability.
YELLOW or LIGHT GREY fields MANDATORY,information required. BLUE or DARK GREY fields CONDITIONALLY,REQUIRED These fields must be completed. when information is available,WHITE fields OPTIONAL information required. when available,Form 1 of Supplier FAI doc,1 Part Number. 2 Part Name,4 FAI Report,5 Part Rev Level,7 Drawing Rev Level.
8 Additional Changes,9 Manufacturing Process Ref,10 Organization Name. 11 Supplier Code,12 Purchase Order Number,13 Delta or Assembly FAI. 14 Full or Partial FAI,Index of part or sub assy Required. required to make assy by,16 Part Name,17 Part S N,18 FAI Report. 19 thru 24 Signatures and Dates,Yellow Required,Blue Conditionally Required.
White Optional,1 Goodrich Part Number,The actual part number that is being FAI. 2 Part Name,The part name listed on the drawing,The Serial Number for the part being FAI. 4 FAI Report Number,FORMAT Suppliers choice We at Goodrich use. Part Number SN FAIREVX If no S N just Part Number FAIREVX. Example 30138 03 1001 FAIREVB,5 Part Rev, Latest part revision that affects the part being FAI If no revisions indicate as such Note The. latest drawing revision Field 7 does not always affect all the parts contained in the drawing. Almost always the same at Field 7,6 Drawing Number.
Here you put in the actual drawing number Not always the same as the part number since many. drawings cover more than one part number,7 Drawing Revision. The revision of the Goodrich drawing for this part that this FAI is being performed to. 8 Additional Changes,Always N A,14 Type of FAI,What is a Full FAI. All Notes and Dimensions with the exception of reference. dimensions on the drawing are measured and or inspected at. the appropriate step in the process,When is it a Full FAI. When one has not been submitted,Two years since manufacturing the part. Changes in manufacturing look at AS9102 for details. When is a Partial FAI used,When a full FAI is on file.
Have partials on all revs up too current rev,To document the changes from an ECO. For a partial FAI enter the reason for the partial. In Reason for Partial FAI put in ECO, Index of Part Numbers or Sub Assembly required to make assembly. The index of part numbers or subs that need to be on this list are all parts. from the parts list If the part is MS put N A for the FAI Report Number. otherwise all the parts must all have documented FAI s on file. All columns must be filled out If NOT the FAI Complete Check box can. NOT be checked and FAI Not Complete must be checked. Sign off 19 20 21 22 23 and 24, Check appropriate box of FAI complete or FAI not Complete. Then text boxes 19 and 20 must be signed and dated by the. appropriate personnel Text boxes 21 through 24 can be as. Form 2 of Supplier FAI doc,5 Material or Process Name. 6 Specification Number,8 Special Process Supplier Code.
9 Customer Approval Y N,10 C of C Number,11 Functional Test Procedure. 12 Acceptance Report Number,13 Comments,14 Prepared By. 5 Material Specification Certification or Special Process Name. Enter materials for example aluminum bar stock and any special. processes for example soldering brazing or painting used in. manufacturing with this product See examples on Example Materials. Special Processes Test Procedures slide,6 Specification Number. Enter the specification number for the material or special process used. for example J STD 001 Mil Specs etc See More examples on Example. Materials Special Processes Test Procedures,Procedures slide. Code is always N A,8 Special Process, Customer given Supplier code for the organization performing special.
process es or supplying material as applicable Or add Special process. supplier name and address,9 Customer Approval Y N, Review customer requirements for special process or material source. Write N A if Customer approval is not required, Number of the certificate special process completion certification. raw material test report number Standard Catalog hardware. compliance report number traceability number,11 Test Procedure Number and Revision. Enter all functional test procedures for example ATP and ESS. used to test the product Include document revision See examples. on Example Materials Special Processes Test Procedures. 12 Acceptance Report Number if applicable, The functional test certification indicating that test requirements. have been met Some reports will not have a report number. 13 Comments,Enter Comments if necessary, Example Materials Special Processes Test Procedures.
Form 3 of Supplier FAI doc,6 Reference Location,7 Char Designator. 8 Requirement,10 Designated,11 Nonconformance,12 Prepared by. The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements are properly understood accounted for verified and documented The purpose of this standard is to provide a consistent documentation requirement How to write up an FAI step by step Supplier FAI s All Detailed Assembly and sub assembly part shall have